Return to Landing

EcoSplit AI

Live Simulation Console
Telemetry Active | 84ms Latency
Grid: ONLINE
Active Grid Import
7.5 kW
Unshaved: 12.5 kW(-5.0 kW)
BESS Dispatch & SoC
3.3 kW
State of Charge:82% (Healthy)
Avoided Cost Rate
$1.77 /hr
Projected:$3,868 / yr
CO2 Abatement
2.24 kg/hr
Annual:~4,901 kg (~225 trees eq.)
Real-Time Dynamic Load Controls
Base Facility Load12.5 kW
2.0 kW (Light)25.0 kW (Heavy Industrial)
Peak Shaving Threshold7.5 kW
2.0 kW (Aggressive)20.0 kW (Permissive)
Grid Tariff Rate$0.48 / kWh
$0.12 (Off-Peak)$0.72 (Critical Peaker)
BESS Storage Split65% (35% Defer)
0% (All Deferred)100% (All Battery Assist)
Real-Time Arbitrage & Cost Reduction
Efficiency η = 92%
29.4%
Cost Slashed
Unmanaged Baseline Cost$6.00 / hr
EcoSplit Arbitrage Net Cost$4.23 / hr
Hourly Arbitrage Margin+$1.77 / hr avoided
Projected 12-Mo Financial ROI$3,868 / year
24-Hour Diurnal Dispatch Waveform (Interactive Scrubbing)
Hover over hours to inspect telemetry
0kW5kW10kW15kW20kW25kWON-PEAK TARIFF WINDOW ($0.48 - $0.72)Threshold: 7.5 kW00:0003:0006:0009:0012:0015:0018:0021:00
Baseline Unmanaged Demand
Active Grid Clamped Draw
BESS Battery Discharge
Peak Shave Threshold
Real-Time Power Flow Topology (Animated Circuit Stream)
OpenADR 2.0b VEN
Utility Grid7.5 kW$0.48 / kWhNeuralSplit Hubv2.4 DispatchΔ 5.0 kW ShavedBESS Battery Storage3.3 kW | SoC 82%20.0 kWh LiFePO4Critical Loads7.5 kWServers / Lighting / MedDeferred Loads1.8 kW ShiftedEV Fleet / HVAC Cycle
EcoSplit AI Co-Pilot
NeuralSplit-v2.4
Executable Energy Diagnostic Actions
NeuralSplit-v2.4•16:41:00•88ms
⚡ EcoSplit Neural Co-Pilot connected to OpenADR 2.0b telemetry stream. Real-time smart split logic is monitoring facility load against TOU peak tariffs. Select an operational preset or click a diagnostic prompt below.